Complete your renovation projects 50% faster
With Sitedrive, construction teams, managers, and subcontractors work from the same plan — spotting issues early, adjusting in real time, and keeping the entire project in sync.
Why renovation needs a different approach
Existing buildings don't follow a straight line
Renovation and transformation projects are iterative by nature: occupied units, hidden surprises behind the walls, and many trades working in tight sequence. Sitedrive was built to make that complexity visible — and manageable — in real time.
Complexity, made visible
Sitedrive breaks each site into locations — floor by floor, apartment by apartment — so conflicts and hidden surprises surface the moment they appear, not weeks later.
Iterative by design
Sitedrive's live schedule updates as reality changes on site — with native support for Last Planner, takt and Gantt side by side, not one rigid method forced on every project.
One shared plan
Main contractor, subcontractors and site teams all work from the same live schedule in Sitedrive — updated from the site, not from someone's inbox.
+300 jobsites are already building faster
Proof from the field
Real projects, real results
Skanska Finland
Apartments · hospitals · renovation · infrastructure
Skanska Finland unified scheduling across its entire project portfolio on Sitedrive — replacing disconnected Excel takt plans with one shared production system that flexes to each project type, renovation included.
"These projects follow completely different logics. We need to manage all production with the same software."
Jan Elfving, Senior Vice President, Skanska Finland
Fira
Renovation and new-build, both run on Sitedrive's takt schedule
Fira uses Sitedrive across very different project types — from renovating occupied buildings to finishing new-build apartments — with the same takt-based approach underneath.
Pipeline renovation — 3 buildings, 63 apartments
A two-hour takt schedule in Sitedrive, materials preassembled ahead of time, and sensors tracking humidity, temperature and dust kept this Helsinki pipeline renovation on schedule with minimal disruption to residents.
New-build interior phase — 61 apartments
On Fira's Postiaukio T1 project, a four-hour takt schedule — one apartment per takt area, materials delivered ahead of time — compressed the interior finishing phase from a planned 12 weeks down to just 4.
Get started
See what Sitedrive can do on your next renovation project
Don’t just take our word for it – get a demo of Sitedrive and see how it helps you to reduce construction times